C WEST HAVEN TRAIN STATION
DSEE Group Inc. led the West Haven Railroad Station Project, a major infrastructure initiative along the Northeast Corridor on the Metro-North New Haven Line. This comprehensive project involved constructing a new station building, two 1,080-foot covered platforms with integral snow-melting systems, a pedestrian overpass bridge, elevator and stair towers, surface parking lots, and a pedestrian plaza.

The project also encompassed significant environmental work, including the management of contaminated soils and groundwater, as well as modifications to existing catenary systems. Additionally, DSEE Group Inc. installed wayside railroad signal equipment along approximately six miles of existing rail lines. The successful execution of this award-winning project required meticulous coordination with Metro-North Railroad and CTDOT, ensuring that all work was completed safely and efficiently without any incidents.

As the Prime Contractor, DSEE Group Inc. self-performed critical aspects of the project, including excavation, cast-in-place concrete foundations, and the erection of pre-cast concrete platforms. The project was completed on time and met all quality and safety standards, further solidifying DSEE Group Inc.'s reputation for excellence in construction and infrastructure development.

Project Details

  • PROJECT: West Haven Train Station
  • MARKETS:Rail & Mass Transit Concrete Civil & Utility
  • CONTRACT TYPE: Speciality Contractor
  • PROJECT OWNER: The Connecticut Department of Transportation
  • LOCATION:West Haven
  • INDUSTRY: Government